
Manufacturing Facility
32% Gas Reduction6 Month Payback This case study illustrates how we applied Industry 4.0 principles to design, build, implement and commission a building automation system,
The case studies we’ve written are all real, even though we may have omitted names for reasons of confidentiality. These are just a selection that illustrate the work we’ve done with ecoDriver.
The articles expand on topics that crop up frequently in our work, hopefully together they will inspire you in your efforts to improve energy and water efficiency and accelerate the decarbonisation of your operations.
32% Gas Reduction6 Month Payback This case study illustrates how we applied Industry 4.0 principles to design, build, implement and commission a building automation system,
10% Electricity Reduction4 Month Payback Visibility of energy profile data makes identifying ‘quick win’ savings much simpler. Following a period of data capture and review,
22% Electricity Reduction3 Month Payback By exposing a schools energy profile ecoDriver can identify controls issues which can be resolved quickly and result in significant
41% Electricity Reduction8 Month Payback A common issue is where separate building control systems are installed but not integrated correctly or commissioned to work optimally
© ecoDriver 2021. All Right Reserved.
Designed and Built by ExtraDigital