Independent School

41% Electricity Reduction 8 Month Payback

A common issue is where separate building control systems are installed but not integrated correctly or commissioned to work optimally together. This is what we found at an Independent school with a recently built building defaulting to higher than designed energy consumption. With the implementation of ecoDriver BEMS to provide interoperability and transparency of the buildings control systems, anomalies were identified and fixed resulting in significant maintainable savings.