Measure, Understand, Act: Inside Mersey Care’s Estates Decarbonisation Journey

November 2026

Managing energy across a complex healthcare estate is rarely about starting from scratch; it is about bringing clarity to buildings that have evolved over decades. For Mersey Care NHS Foundation Trust, the journey towards smarter energy management began in April 2025 at the Hollins Park site, setting the stage for a much wider transformation across the trust’s portfolio.

Laying the Groundwork for Estate Intelligence

Rather than attempting an overnight overhaul, the initial focus was on establishing a reliable data foundation. The trust gradually expanded its meter coverage, bringing in fiscal meter information from key operational locations such as Formby Clinic and Hartley Hospital—where on-site solar generation is also actively tracked on ecoDriver.

Understanding precisely what energy is being consumed, where it is going, and when it is being used provides the essential baseline needed before any meaningful efficiency work can begin.

Fast-Tracking Expansion Through Strategic Funding and Procurement

In September 2026, momentum accelerated significantly. Through a successful funding bid put together jointly by the Mersey Care team and ecoDriver, the trust secured Centralised Energy Purchasing Agreement (CEPA) funding to fast-track a comprehensive sub-metering roll-out across five key sites:

  • V7 Building
  • Rathbone Hosptial
  • Clock View Hospital
  • Maghull Health Park
  • Peasley Cross Hospital

To ensure a compliant and straightforward route to market, the contract was procured via the NHS Shared Business Services (SBS) framework with the support of ecoDriver’s framework partner, Bramble Hub.

This expansion introduces electric sub-meters across all five locations, alongside strategic heat meters deployed at targeted sites. Notably, this includes specialised work at Maghull Health Park, a secure clinical unit with unique access and operational requirements.

Smart Design and CIBSE TM39 Compliance

Getting meters in the ground is only half the challenge; ensuring they capture the right data is where design expertise matters. ecoDriver conducted thorough site surveys to produce a sub-metering strategy and design fully aligned with CIBSE TM39 guidelines, ensuring meters are placed where they deliver maximum operational usefulness.

Crucially, the approach centres on making the most of the equipment and services already in place rather than defaulting to expensive plant replacements. Different estate environments present distinct operational puzzles:

  • Clinical Areas: Challenges often involve subtle heating and cooling conflicts, manual interventions where systems get left switched to manual, or a lack of degree-day correlation that can mask underlying plant faults.
  • Administrative Spaces: Out-of-hours energy consumption frequently occurs because schedules and heating settings are left misaligned with actual building occupancy.

Uncovering these patterns makes energy waste visible so it can be addressed directly.

Measuring Real-World Success and Looking Ahead

With project completion scheduled ahead of March 2027, the immediate focus is finalising meter designs for formal trust sign-off. Beyond meeting essential internal and Estates Returns Information Collection (ERIC) reporting requirements, the captured data gives Mersey Care a transparent view of building performance.

When new decarbonisation technologies are installed across the estate, the platform provides a true reflection of their success. This ensures that high-performing interventions can be confidently replicated elsewhere—maximising the impact of every pound invested in sustainability.

For both NHS trusts and commercial property portfolios managing multi-site estates, turning complex utility data into clear, actionable insight is the proven path to smarter operations.

Could Better Energy Data Unlock Savings Across Your Estate?

To learn how ecoDriver can help your organisation map out a targeted metering strategy, identify hidden energy waste, or build data-backed cases for future energy investments, get in touch with our team today.

Case Studies

Happy Clients